The Property features 17′ Clear height, a paint booth, 3-phase power supply (600+Amps), a dedicated office space of 1,000 Sf, a second floor with a another 1,000 Sf for Office or storage space, and a brand new A/C unit.
Directly behind the subject property there are several Mixed-use develoment proposed and under construction with a total of 1,200 units being delivered between the year 2025-2026. This is a highly sought out location due to the ability to change the zoning. This area is now meant for TOD (Transit-oriented Developments).
The MetroMover, Tri-rail, and Amtrak Station is located One(1) block away from the subject property for convenient transportation.